97.不要懼怕失敗否則你永遠(yuǎn)不可能成功,但是你要時刻準(zhǔn)備挽回可能的失敗。其中一條就是知道誰能幫你。
Rule #98: One of the advantages of NASA in the early days was the fact that everyone knew that the facts we were absolutely sure of could be wrong. 98. 早先NASA的優(yōu)勢之一就是每個人都相信我們確信的事情毫無疑問是正確的。
Rule #99: Redundancy in hardware can be a fiction. We are adept at building things to be identical so that if one fails, the other will also fail. Make sure all hardware is treated in a build as if it were one of a kind and needed for mission success. 99.硬件冗余就是一個幻想。我們善于配置兩個一模一樣的東西,以至于其中一個失效,另一個也會出問題。確保系統(tǒng)中所有的硬件都被看成是成功完成任務(wù)所必須的那一類中的一個。
Rule #100: Never make excuses; instead, present plans of actions to be taken. 100. 不要找借口;與此相反,要準(zhǔn)備將要采取的行動。
此文章共有23頁 上一頁 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23
文章來源:中國項(xiàng)目管理資源網(wǎng)
|