軍用飛機(jī)維修質(zhì)量管理的問題分析
2011/11/30 15:23:13 |
8245次閱讀 |
來源:
【已有條評論】發(fā)表評論
op and innovate to meet the aviation industry in the new situation and new changes. With the development of a new generation of military aircraft, its maintenance technology, just changing. Maintenance of quality requirements of the maintenance work in the personnel, equipment, materials, time and information resources for its effective organization and control to the lowest consumption of resources to obtain the best quality. Aircraft maintenance is a complicated systematic project, the need for aircraft to conduct system-wide, life-cycle management, from the election of a new aircraft fitted to the aircraft at all levels of maintenance, and repair errors in the investigation, until the retirement of aircraft, the need for strict management to ensure the quality of the aircraft to achieve the original design level. Maintenance work of any errors is likely to endanger the safety of aircraft operations.
Aircraft maintenance requirements of the maintenance work in the personnel, equipment, materials, time and information resources for its effective organization and control to the lowest consumption of resources to obtain the best quality. Maintenance work of any errors are likely to endanger the safety of aircraf
本論文由無憂論文網(wǎng)www.51lunwen.com整理提供
支付后,我們將在24小時(shí)內(nèi)發(fā)到您的郵箱,請支付后通知我們發(fā)送論文,謝謝。
houqinzhichi@qq.com 購買論文,匯款確認(rèn)信郵箱。
項(xiàng)目經(jīng)理勝任力免費(fèi)測評PMQ上線啦!快來測測你排多少名吧~
http://opto-elec.com.cn/pmqhd/index.html
網(wǎng)站文章版權(quán)歸原作者所有,如有認(rèn)為侵權(quán)請聯(lián)系我們,將于1個(gè)工作日內(nèi)作出處理! |