PMP考試模擬試題(一)
1. Buyers use a variety of methods to provide incentives to a seller to complete work early or within certain contractually specified time frames. One such incentive is the use of liquidated damages. From the seller's perspective, liquidated damages are what form of incentive? a. Positive b. Negative c. Nomi d. Reverse e. Risk-prone 買主使用各種方法以使承包商更早的或在某些契約指定時間框架內(nèi)完成工作。一種方式是清算賠償金的應(yīng)用,從承包商的觀點看,清算賠償金是那一種類型的激勵? a. 積極地 b. 消極地 c. 輕微地 d. 反面地 e. 風險傾向地 2. Payment bonds are often required by the contract and require specific actions under the stated conditions. Payment bonds are specifically designed to ensure that the prime contractor provides payment of- a. Insurance premiums b. Weekly payrolls c. Incremental earnec d. Subcontractors, laborers, and suppliers of material e. Damages for accidents caused 在合同中通常需要付款保函,同時在所陳述的情況下需要采取特別措施。付款保函是專門用于保證為主要承包商提供什么樣的付款- a. 保險費 b. 每周的薪水 c. 增加所得 d. 轉(zhuǎn)包商、勞動力和原料供應(yīng)l e. 意外事故造成的損失 3. When a seller breaches a contract, the buyer cannot receive- a. Compensatory damages b. Punitive damages c. Specific performance d. Liquidated damages e. All the above
|
|